Plastic Construction Material PVC Rainwater Gutter
This product is a core component of a building exterior rainwater drainage system made of high-strength polyvinyl chloride (PVC). Specifically designed for the efficient collection and diversion of roof rainwater, it effectively protects building exteriors and foundations, providing a durable and economical drainage solution for modern residential and commercial buildings.
1. Modular design with complete components (sinks, connectors, elbows, downpipes), supporting rapid on-site cutting and assembly to adapt to different roof profiles.
2. Available in a variety of commonly used architectural colors such as white, brown, and gray, offering a clean visual appeal and harmonious integration with various building exteriors.
3. Effectively guides rainwater away from walls and foundations, significantly reducing the risk of leaks, erosion, and basement flooding, protecting the building structure.






1. PVC double-color coextrusion, color never fade |
| 2. High temperature resistance, anti-aging, anti-oxidant, acid- base mold erosion resistance, oxida |
| 3. Easy to cut and install |
| 4. Ethylene polymer material, leed-free, good UV performance |
5. Recyclable |


1.Q: What is your product line?
A: We specialize in PVC trunking, PVC pipe, PPR pipe and fittings.
2.Q: Are you a manufacturer?
A: Yes, We are a factory located in Foshan City, Nanhai District, Danzao Town, Hengjiang New Road.
More than 10 years of industry experience.
3.Q: If I want to get a quote, what information should I notify?
Answer:
(1) Product size (width x height x length, thickness).
(2) Color.
(3) Quantity.
4.Q: Can we print our logo or company name on your product or packaging?
A: Yes, you can.
5.Q: What is the payment term?
A: We accept T/T or L/C, as well as the top 30% deposits of T/T, Western Uion,
6.Q: Is the sample free?
A: We can send samples within 5 days, but the shipping cost needs to be paid by you.
When we have a formal order, its cost will rebound.
7.Q: How to control your quality?
A: We strictly select high quality raw materials and regularly check quality control during production.
8.Q: How long should your delivery date be?
A: Usually 15 days after receiving the deposit, it also depends on your product and quantity.


Certificate

